Miami County, Indiana

Permits, utilities and flood notes for Miami County, where the county seat is Peru, plus the towns we cover here.

Towns in Miami County

Permits

Building department: City of Peru Building Department (Building, Zoning & Code Enforcement), City Hall, 35 S Broadway, Peru, IN 46970; (765) 473-4881; Monday, Tuesday, Thursday and Friday 8:00 a.m. to 4:00 p.m., Wednesday 8:00 a.m. to noon. It issues permits for construction, demolition and occupancy inside Peru, including electrical upgrades, roofing, pools, renovations and new builds. Outside the city, the Miami County Building Commission is in the Miami County Courthouse, 25 N Broadway, Room 101, Peru; 765-472-3901 ext. 1291; Monday to Friday 8 a.m. to 4 p.m.

  • Peru: plumbing, HVAC, electrical and roofing need a permit. In Peru, a residential permit is required for any new structure, accessory building, addition, electrical, roofing, plumbing or HVAC work on a residential property (one- and two-family dwellings, modular/manufactured homes and duplexes). Property with more than a two-family dwelling needs a commercial permit for the same kinds of work. Source
  • Peru: approval before work starts. For minor remodeling in an existing Peru structure, including electrical or roofing work, the application must be reviewed and approved by the Building Commissioner before work starts. Additions and new construction need a plot drawing with lot dimensions, existing buildings and clearances to all lot lines, reviewed by the Zoning Administrator and the Building Commissioner before work starts. Source
  • Peru roofing permit inspections. Peru's roofing-only permit lists the required inspections as pre-felt and final, or pre-metal and final, with an inspection also required when the job includes structural reconfiguring or repair. Inspections are scheduled by calling the Building Department at 765-473-4881, and the city recommends calling at least 24 hours ahead. The work is not permitted until the permit is signed and issued by the city. Source
  • Contractor registration in Peru and Miami County. Contractor registration is required in the City of Peru, its jurisdiction and all of Miami County. A contractor who does not register cannot obtain permits, for the contractor or the customer (Peru City Code 152.18 C). Registrations run January 1 to December 31, and the City of Peru and the Miami County Building Department offer cross registration, so registering at either office covers both jurisdictions. Source
  • Peru electrical contractor test. An electrical contractor registering with the City of Peru must pass an open-book test: 72% is based on the 2017 NEC code book and 28% on Peru Utilities' local residential service standards. Source
  • Peru Building Department duties. The Peru Building Department reviews plans and permit applications, issues and monitors contractor registrations and licensing, and investigates unsafe building concerns and code violations such as substandard properties. Source
  • Miami County contractor registration. Miami County registers contractors and subcontractors through the Schneider GeoPermits online system; applicants provide an up-to-date certificate of liability insurance, and a registration is valid from January 1 through December 31 of the same year. Source
  • County planning outside Peru. The Miami County Planning Department handles planning and zoning administration, ordinance violation review and unsafe building matters, with online permits through Schneider Geospatial. Its jurisdiction map marks the Peru, Bunker Hill and Converse areas as outside the county planning department's jurisdiction. Source
  • Floodplain permits. Peru's Building Department has a separate Floodplain Permit application, and commercial new builds must include state design release, Rule 5 and floodplain requirements. Miami County adopted a Flood Damage Prevention Ordinance on Aug. 7, 2023. Source
  • Indiana plumbing license. Indiana law makes it unlawful to act as a plumbing contractor or journeyman plumber without a license, and a corporation in the plumbing contracting business must itself be licensed as a plumbing contractor. Licenses can be checked on the Indiana Professional Licensing Agency's online verification search. Source
  • Indiana codes in effect. Indiana adopts building codes statewide: the 2020 Indiana Residential Code (675 IAC 14-4.4, based on the 2018 IRC) took effect Dec. 26, 2019; the 2012 Indiana Plumbing Code (675 IAC 16-1.4) on Dec. 24, 2012; the 2014 Indiana Mechanical Code (675 IAC 18-1.6) and 2014 Indiana Fuel Gas Code (675 IAC 25-3) on Dec. 1, 2014; and the Indiana Electrical Code, 2009 Edition (675 IAC 17-1.8, based on the 2008 NEC) on Aug. 26, 2009. Source

Rules change, so check with the department before work starts. A provider can usually tell you whether they pull the permit.

Utilities

  • Peru Utilities. Peru Utilities is a municipally owned, multiple-service utility that provides electric, water and wastewater treatment services to Peru, the neighboring Grissom Aeroplex and about one third of rural Miami County. Main office: 335 E Canal St, Peru; phone (765) 473-6681. Source
  • Peru water system. Peru's water system serves about 4,750 customers, generally inside city limits. Raw water comes from the Teays River Aquifer through 4 wells with a combined maximum capacity of 9.5 million gallons per day; the treatment plant can treat up to 4 million gallons per day, and the system stores 3.35 million gallons of treated water. Source
  • Peru water source. Peru Utilities has five water wells (four in operation) in the saturated sand-and-gravel fill of the buried Teays Valley, which the Wabash River's valley (the Wabash-Maumee Trough) crosses at Peru. A source water assessment rated the system's susceptibility as lower. Source
  • Water quality report highlights. Peru's 2025 water quality report shows no violations for the substances it lists. In 2023 lead and copper sampling, the 90th percentile lead level was 7 ppb, with 1 of 30 sites above the action level; the report points residents to the state lead service line inventory at idem.120water-ptd.com. Source
  • Lead service line replacement. Peru Utilities runs a lead service line replacement project: homeowners complete a Right of Entry form so the utility can inspect the service line inside the home and, if needed, put it on the replacement schedule. Source
  • Peru sewers (mostly combined). Peru's wastewater operation serves about 4,800 customers, generally inside city limits, and maintains 65 miles of sewer collection system, most of it combined sanitary and storm sewers. The activated sludge treatment plant is rated at a maximum of 8 million gallons per day with a peak of 26 million gallons per day. Source
  • Electric provider (IURC map). The Indiana Utility Regulatory Commission's electric service territory map places central Peru in the territory of Peru Utilities, a municipal electric utility. Source
  • Natural gas provider (NIPSCO). NIPSCO's gas service tariff lists Peru (Miami County) among the communities it furnishes with natural gas, along with Bunker Hill, Denver, Grissom AFB, Macy and Mexico in Miami County; rural territory next to each listed community is in the same rate zone. Source
  • Water system (EPA map). EPA's community water system boundary map places central Peru inside the Peru Water Department service area (PWSID IN5252016). Source

Flooding

  • Wabash River flood stage at Peru. 20 ft Source
  • Wabash River flood categories and record. NWS flood categories for the Wabash River at Peru (USGS gauge 03327500, forecasts by NWS Northern Indiana) are 15 ft action stage, 20 ft minor, 21 ft moderate and 24 ft major flooding. The record crest is 28.1 ft on March 26, 1913; the next highest is 24.46 ft on May 18, 1943. Source
  • What each river level means for Peru. NWS impact notes for the Peru gauge: at 20 ft unprotected areas of Peru flood; at 22 ft water nears the top of Peru's flood protection, River Road floods and homes near US 31 on the far west side are affected; at 24 ft water overtops the city levees and homes and businesses are under water; at 26 ft southern Peru floods extensively and SR 124 is blocked; at 28 ft downtown Peru is under 2 to 6 feet of water. Source
  • Recent Wabash River crests. In the NWS crest history for Peru, the last crest at or above the 20 ft flood stage was 20.78 ft on April 29, 1959. Higher water since then includes 19.45 ft (April 23, 1964), 18.18 ft (April 19, 2013) and 18.14 ft (June 16, 2015); the most recent listed crest is 15.58 ft on Feb. 28, 2021. Source
  • 1913 flood and upstream reservoirs. In the March 1913 flood, eleven people drowned in Peru and two-thirds of the city was damaged or destroyed; the Wabash peaked at 118,000 cubic feet per second, almost 7 times any earlier flood. By early 1969 three Corps of Engineers dams (J.E. Roush, Salamonie and Mississinewa) were in place; together they provide flood control for 78% of the drainage area upstream of Peru. Source
  • Mississinewa River at Peoria. NWS flood categories for the Mississinewa River at Peoria, near the Mississinewa Lake dam about 6 miles southeast of Peru, are 10 ft action stage, 11 ft minor, 13 ft moderate and 17 ft major flooding. The record crest is 19.26 ft on June 11, 1958; listed crests since 2014 have stayed under 9 ft. Source
  • Wabash River levees (FEMA). FEMA's National Flood Hazard Layer shows Wabash River levee segments within about 3 miles of downtown Peru with a status of de-accredited. Source
  • Current FEMA flood map. The FEMA flood map panel covering downtown Peru (18103C0114D) is a countywide panel with an effective date of Sept. 28, 2012. Source
  • February 2018 heavy rain. NWS Northern Indiana storm totals for Feb. 19-22, 2018 in Miami County included 4.38 inches 3 SSE of Macy, 4.16 inches 2 E of Bunker Hill and 3.01 inches in Peru. Source

Sources

Last updated