Adams County, Indiana

Permits, utilities and flood notes for Adams County, where the county seat is Decatur, plus the towns we cover here.

Towns in Adams County

Permits

Building department: Inside Decatur city limits: City of Decatur Building & Zoning Department, 172 N 2nd Street, Decatur, IN 46733; 260-724-3814. It issues all city building and improvement permits and does code inspections. In rural Adams County and the Towns of Geneva and Monroe: Adams County Building & Planning, 313 W Jefferson Street, Suite 338, Decatur; 260-724-5305; Monday to Friday 8 a.m. to 4 p.m.

  • Decatur: plumbing, HVAC and electrical permits. Decatur's mechanical permit covers electrical, heating and air, and plumbing work, with each trade permitted separately. The application asks for the water heater type and location, heating system, electric service and subpanel size, and any solar or generator system. Source
  • Decatur building and remodel permits. Decatur's building permit application covers new construction, additions, remodels and other work, and asks for a detailed site plan. The permit is not valid and work is not permitted until the Building and Zoning Department signs and issues it, and later changes must be resubmitted for approval. Source
  • Decatur contractor registration. All contractors must register with the City of Decatur and show proof of liability insurance. The registration form has categories for general, electrical, plumber, HVAC, mechanical, roof and other trades, and asks for a certificate of insurance. Source
  • Decatur inspections. The City of Decatur asks for 24-hour notice before any inspection. Its list includes footings, underslab plumbing and heating, slab, framing, rough electrical, electrical service before utility hookup, rough plumbing, rough heating, fire stopping and a final inspection before occupancy. Source
  • Decatur: floodplain and floor height. Decatur requires a surveyor's elevation certificate for all construction in or next to the floodplain. For a new building, the site plan must show a finished floor 15 inches above the high point of the street crown between the property lines. Source
  • Decatur generator permits. Decatur has a separate permit application for natural gas, LP gas and diesel generators. The technician and the homeowner must both be on site for the final inspection. Source
  • Decatur demolition permits. Before Decatur issues a demolition permit, an asbestos report from a licensed asbestos agency must be filed with the Building Department. Utilities must be located and terminated before demolition begins. Source
  • Adams County permits outside Decatur. In rural Adams County and the Towns of Geneva and Monroe, the county Building & Planning department issues building permits for new construction and remodels, electrical permits for new or upgraded service, and location permits that check new construction against zoning and flood maps. It does not cover the City of Decatur, which has its own department. Source
  • Adams County: furnace, gas and electrical work. Adams County's permit schedule, for areas outside Decatur that the county covers, lists furnace installations, gas line pressure tests, gas log and wood-burner installations as single-inspection projects, and new gas lines with appliance installation as a gas permit. Remodels, electrical upgrades and temporary service do not need the extra location permit that the county's other permits require. Source
  • Adams County septic permits. In Adams County, anyone building a home, remodeling, or repairing a failing septic system starts with the Health Department's Environmental Health Division. An on-site sewage permit is required before the county building permit, and the department refers owners to excavation contractors it has tested and certified. Source
  • Indiana plumbing license. Indiana makes it unlawful to act as a plumbing contractor or journeyman plumber without a state license. A corporation in the plumbing contracting business must itself be licensed as a plumbing contractor through the Indiana Plumbing Commission. Source
  • Indiana codes in effect. Indiana adopts building codes statewide: the 2020 Indiana Residential Code (based on the 2018 IRC) took effect Dec. 26, 2019; the 2012 Indiana Plumbing Code on Dec. 24, 2012; the 2014 Indiana Mechanical Code on Dec. 1, 2014; and the Indiana Electrical Code, 2009 Edition (based on the 2008 NEC) on Aug. 26, 2009. Source

Rules change, so check with the department before work starts. A provider can usually tell you whether they pull the permit.

Utilities

  • Decatur water system. The City of Decatur's water department supplies ground water from four wells in Decatur and two in Berne, treated at two plants with a combined capacity of 3 to 3.5 million gallons a day. The system has three water towers and about 58 miles of mains. Source
  • Decatur water source. Decatur's six production wells, in the East Plant and Decatur-Berne well fields, draw from a bedrock aquifer. A source water assessment rated the supply moderately susceptible to contamination, and the city runs a wellhead protection plan. Source
  • Water system (EPA map). EPA's community water system boundary map places central Decatur in the Decatur Water Department system (PWSID IN5201002); the boundary is modeled. Source
  • Decatur sewer system. The City of Decatur runs its own wastewater plant, with a design flow of 3.25 million gallons a day and a design peak of 7.1 million. The city warns that flushed wipes cause blockages and backups in house drains and in the sewer system. Source
  • Decatur storm water. Decatur's Storm Water Department, 260-301-8358, was formed in January 2004. It maintains the city's state stormwater permit, makes improvements and does field inspections. Source
  • Electric provider (IURC map). The Indiana Utility Regulatory Commission's electric service territory map places central Decatur in the territory of Indiana Michigan Power Company. Source
  • Natural gas provider. Adams County's hazard mitigation plan names NIPSCO as the natural gas utility in Adams County, and Decatur's demolition permit lists NIPSCO among the utilities to contact before demolition. Source
  • Adams County Regional Sewer District. The Adams County Regional Sewer District, 313 W Jefferson Street, Room 337, Decatur, 260-724-2995, is the county's sewer district and publishes a map of the areas it serves. Source
  • Solid waste: Adams County district. The Adams County Solid Waste Management District, 3775 N 200 E, Decatur, (260) 724-9971, takes household items containing mercury, such as fluorescent bulbs and old fever thermometers, for recycling. Source

Flooding

  • St. Marys River flood stage at Decatur. 17 ft Source
  • St. Marys River flood categories and record. NWS flood categories for the St. Marys River at Decatur (gauge DCRI3, USGS 04181500) are 13 ft action stage, 17 ft minor, 20 ft moderate and 24 ft major flooding. The record crest is 26.92 ft on July 9, 2003, followed by 25.11 ft on June 18, 2015. Source
  • What St. Marys flooding reaches in Decatur. NWS impact statements for the Decatur gauge: at 18.5 ft low areas of Kekionga Park begin to flood; at 21.5 ft residential flooding begins on East Jackson and Ogg streets; at 22.5 ft Piqua Road begins to flood and Ogg Street evacuations begin; at 23.5 ft many east side streets flood and residents near Bellmont High School need to evacuate. Source
  • Past St. Marys crests at Decatur. Other high St. Marys River crests at Decatur include 24.4 ft on March 14, 1982, 24.31 ft on Feb. 25, 1985, 24.2 ft on Jan. 14, 2005, and 23.6 ft on Feb. 8, 2008, all above the 17 ft flood stage. Source
  • September 2026 flood. In September 2026 the St. Marys River at Decatur was in moderate flood for several days. Provisional USGS readings stayed above 22.5 ft from the afternoon of Sept. 18 into Sept. 22 and reached 23.08 ft on Sept. 21. Source
  • June 2015 record rain. NWS records show 15.25 inches of rain at its station 1 mile north of Decatur in June 2015, against a normal of 4.09 inches. That set a monthly record for the station, whose records began in 1931. Source
  • USGS Decatur flood maps. The USGS mapped likely flood extent and depth along 8.9 miles of the St. Marys River at Decatur for river stages from about 13 ft to above the 2003 record. The river drains 621 square miles at the Decatur gauge, with headwaters in western Ohio. Source
  • Southern Adams County: Wabash record. The Wabash River at Linn Grove in southern Adams County set a record crest of 14.86 ft on Sept. 18, 2026, passing the 14.76 ft record of July 8, 2003. Source
  • Adams County floodplain office. For rural Adams County, Geneva and Monroe, Adams County Building & Planning, 260-724-5305, keeps current flood zone maps and checks location permits against them. Source
  • FEMA flood map panel. FEMA's National Flood Hazard Layer shows central Decatur on Flood Insurance Rate Map panel 18001C0108E, a countywide panel effective Sept. 29, 2010. Source
  • NWS office. The National Weather Service Northern Indiana office in Syracuse (7506 E 850 N; 574-834-1104) is the forecast office for the St. Marys River gauge at Decatur. Source